user:kluong:improvement_-_technical_orientation

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
user:kluong:improvement_-_technical_orientation [2021/04/01 13:25]
kluong
user:kluong:improvement_-_technical_orientation [2021/09/19 21:59] (current)
Line 1: Line 1:
 ====== Technical Orientation ====== ====== Technical Orientation ======
 +
 +**Background** ​
  
 There is the normal scel orientation meeting, but I'm starting to think that it might be useful to have a technical There is the normal scel orientation meeting, but I'm starting to think that it might be useful to have a technical
Line 6: Line 8:
 engineers are familiar with the tools, processes and existing systems that the company uses. engineers are familiar with the tools, processes and existing systems that the company uses.
  
-Things that could be covered:+**Things that could be covered**
  
   * Version control   * Version control
   * Github (PRs and stuff)   * Github (PRs and stuff)
-  * How the existing ​system ​works +  * Existing ​system ​overview/​architecture 
-  * How to deploy ​services+  * Deploying web services
   * Infrastructure (dashboard, scelserver-1,​ infrastructure github, etc).   * Infrastructure (dashboard, scelserver-1,​ infrastructure github, etc).
   * types of work to expect (science/​research,​ development,​ operational)   * types of work to expect (science/​research,​ development,​ operational)
Line 21: Line 23:
     * generating ssh certificates ​     * generating ssh certificates ​
   * software engineering?​   * software engineering?​
 +  * querying the control_tower database for information
  
 I think this should be conducted in the first week or so, alongside the normal orientation. I think this should be conducted in the first week or so, alongside the normal orientation.
  
-Couple of things I haven'​t considered yet+**Couple of things I haven'​t considered yet**
  
   * what is the timing with the CDR/​PDR/​etc?​   * what is the timing with the CDR/​PDR/​etc?​
Line 36: Line 39:
   * what is covered in EE 160?   * what is covered in EE 160?
   * might be good to get a survey of who has what experience   * might be good to get a survey of who has what experience
 +  * how is training currently conducted?
  
-Tasks+**Tasks**
  
-  * Review the current orientation+  * Review the current orientation, and see what content is covered there
   * Detailed outline of content   * Detailed outline of content
   * Documents   * Documents
  • user/kluong/improvement_-_technical_orientation.1617283503.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)