====== Team Apple Meeting Minutes for Week of October 28, 2019 ====== ==== Updates==== * Update Keoni and Noah about Apple v4.1.1 and Apple v4.1.0 * Archiving Wiki Apple Spring 2019 * We were able to send data packets to the firmware database * Trying to fix voltage problems * Update Eagle schematic and PCB to have the RX connected to pin 2 and TX connected to pin 9 on the Pro Mini. * Continue making more PCB boards and taking apart the old ones to reuse their female/male headers * Update Wiki Convert Eagle Files to Gerber Files: Make sure to be in "Board Eagle Window" * change with the dimension readings from "inch" to "mm" since SEEED Studio only takes * them in "mm", right click on the dimension arrows where it'll eventually light up and pop-up options * -> Properties -> click on "Unit" to change from inch to mm then follow below * -> File -> CAM Processor... -> CAM Processor window will pop-up takes 3 seconds * -> check box "Export as ZIP", you may check over the individual layers on the left side under "Gerber" * -> Finally click "Process Job" -> save the ZIP file in your desired directory -> OK -> "Discard" To save pictures of the Eagle Schematic and Board: * -> File -> Export -> Image -> Browse (for desired directory to be saved in) -> OK SEEED Studio Options * -> Google "seeed studio pcb" -> click on "Fusion PCB/PCBA - Seeed Studio" -> Add Gerber Files * -> Mostly everything stays the same except the dimensions *Units in mm, desired PCB color, * and maybe the number of layers if more than the usual 2 layers (or less) ==== Reminders ==== * Critical Design Review (CDR) on Saturday, 11/16 * RonHo order (Voltage Regulators) scheduled delivery on the end of October (delayed) * Mid Semester Progress Report due Thursday, 10/31 [[weatherbox:apple:start|Back to Apple Homepage]]