=====Cranberry Status Meeting #3 - September 23, 2015===== **Attended: Brandon, Kim Pee, Jon** =====Updates===== * Not all parts working properly * Solar charging chip - due to chip layout * Assemble and test boards * Work with Kenny to program boards * Make note of what is not working properly * Verify connections and voltage measurements * Isolate hardware problems * Revise current design * Recreate part library in EAGLE * Library for parts available, but not up to quality * Remake parts for more control with layout * Must use 2 in. x 2 in. profile * Freedom with layout * Incorporate 4 layer board * Tighter and cleaner layout, proper clearances * Isolate traces on top and bottom layers * Central layers ground and power * Alternate packages and parts - design preferences * Similar or better, worth cost? * Consider more efficient sizes/form factors * Go through schematic, understand connections * How parts work with each other * Create more professional schematic * Current schematic unprofessional due to layout * Group sensors, interfaces, communications, power, etc. * Documentation in schematic * Current documentation lacking * Currently no uniformity * Provide labels and extra information (placement layouts, no empty pads, dedicate space) * Effective use of space - no empty areas / wasted space * Debug lines traced, Vias for power, etc. * Resistance values shown for schematic * Label part values * Part layout at own discretion * Wire overlapping unwanted * Microcontroller layout same as on board chip * Pins in order * Good documentation for software * Divide work between members * Clean and update schematic * Recreate parts * Jon will find board and assist with soldering QFN and small ICs * Manufacturing * High quantity, cheap - Chinese vendor * Quality, price not a problem - Advanced Circuits * Quality, time - Bay Area Circuits * components * Barometer, solar irradiance * Solar charging chip * Voltage regulators * XBee =====Problems===== * N/A =====Reminders===== * Prepare for proposal presentation on Saturday, September 26 * Meeting with Dr. Kuh for Weekly Update next week * Plan to start assembly next week and begin testing in coming weeks * Look over schematic and other documentation to understand design