=====Dragonfruit Team Meeting - November, 2016===== Attended: Keane, Kevin, Tyler ==== Updates ==== * Soldered more parts onto PCB #5, version 2 * Schematic previously followed found to be for version 1 * Version 2 schematic and eagle files found, soldering will continue * Parts on each version are relatively the same, therefore no major changes need to be made * Found a fully soldered version 2 Dragon Fruit PCB on solder bench, labeled as #3 * Previously, board #4 was being used to program and deploy, but failed proved to be faulty and stopped transmitting after being handled * Board #3 fully programmed without any problems * Board #3 continues to transmit even after being completely disconnected, then reconnected (board #4 would need to be reprogrammed if this was done) * Board #3 deemed as deployable by firmware * XBee, Sensors, and Housing ready for deployment * Waiting for key to get to roof ==== Problems ==== * Solved many problems this week * Board #4 still buggy and faulty * Resolved problem of having the wrong schematic version for the PCB design ==== Goals for this week ==== * Deploy board as soon as we have access to roof (before CDR) * Start creating CDR presentation * complete by Wednesday November 9th * Continue soldering on board #5 * Draft a new PCB with Real Time Clock and GPS * Look for GPS that can idle * to solve space issue consider another tier of parts * consider creating another tier on sensor board * same connections to MCP through SDA and SCL