=====Xbee Team Meeting #22 - March 31, 2016===== Attended: Ernesto, Kaeo, Tyrin, Tryston, Michael =====Updates===== * Tested XBees while it was sunny * Tested in same location (Holmes 1st floor) as tests in the rain to minimize variables * Data gathered every 30 ft. * Soldered on RP-SMA Connector * RSSI values affected greatly with RP-SMA connector soldered on =====Problems===== * RSSI values affected greatly when soldering on RP-SMA Connector * Need to find different alternative =====Reminders===== * CDR Presentation on Saturday, April 2, 2016 * Upload CDR presentation on drive