====== Date: 12 March 2018 ====== * Continued brainstorming constructions aspects of Wind Tunnel * Awaiting additional parts to arrive ====== Date: 14 March 2018 ====== * Received additional parts for Wind Tunnel (including fans, building materials, and additional Teensy devices) * Continued work on Wind Tunnel ====== Date: 15 March 2018 ====== * Tested PC fans for voltage limits (all 4 in parallel) * Constructed second Wind Tunnel shell for testing * Brainstormed how to connect all 4 fans together in a grid ====== Date: 16 March 2018 ====== * Worked on CDR Presentation * Presentation will be next Tuesday due to a member being absent for presentation day * Planned cuts for materials (airflow straightener, plexiglass)