3D plot: 2011, 2012 normalized and unnormalized for comparison
LA more variation, but smoother
Moving Average and Decimation/Downsample
D and X from 2011:
X = 8:00-4:00 (input data)
D = 9:00-5:00 (normalized and downsampled, column)
Y = Least Squares Equation = W.T(X) row = X.T(W) column
Unnormalized = D bar, Y bar
Statistical:
Y - sig*Y + m
D - sig*D + m
Zenith:
Y*cos(theta)
D*cos(theta)
W = (XX.T)^(-1)*XD ⇐ XX.T*W = XD
E^2 Averaged = (D-Y)^2 for every time
MSE = 1/m (||D-Y||)^2
Don't need r bc cancel
Ask Seyed what he did for decimation/downsample
Filter then normalize
Normalize then filter
Normalization: mean then deviation
Zenith Angle Filter: Zenith angle is from the 5th minute, 5 irradiance is averaged
Statistical normalization: -mean/deviation
Estimate will need to be given back after the normalization
3D plot for both zenith and stat normalization
Plot MSE
Check 2012 MSE test against 2011 MSE train
Flip: 2011 MSE test against 2012 MSE train
Correlation is 3D plot