training:bill_of_materials

Bill of Materials



A bill of materials, often referred to as a BOM, is a list that contains the hardware components used in the project. The listed information includes the description of the parts, the vendor from which the parts were bought from, the product identification/number, the unit cost, and the quantity. An important part of the bill of materials is the total unit sub cost of the parts.

Part Description Part Name Vendor Product ID/# Unit Cost Quantity
Solar Irradiance Sensor Stabilizer AL-100 Solar Sensor Leveling PlateApogeeAL-100$35.00|1|
|**Total Unit Sub Cost**|$35.00
  1. Create a bill of materials that includes the parts listed below:
    1. Atmel Atmega328P
    2. Maxim DS18B20
    3. Sensirion SHT11
    4. Adafruit BMP-180
    5. Tenergy 18650
  2. Email your Mentor/Leadership Team with your team's completed bill of materials attached in .pdf or .xlsx with subject line “[SCEL] Team *yournamehere's Sample BOM” (Don't forget to cc “[email protected]” in all your emails!).

Authors

Contributing authors:

dkvilla kluong tbesas

Created by kluong on 2016/01/19 00:50.

  • training/bill_of_materials.txt
  • Last modified: 2021/09/19 21:59
  • (external edit)