ust:meeting_minutes_november_10_2016

Attended: Tim, Dylan, Nathan, Allie(Alan), (M)Andrew, Kenny

  • CDR this Saturday

Firmware

  • Apple:
    • Rewrote XBee library
      • Reduced usage by around 15%
    • Working with UltimateGPS library
      • Raised memory usage to 91%
      • Potential issue
    • Second box to be deployed in near future
  • Cranberry:
    • Modified command mode
      • Functionality for sampling specific sensors
    • Negative temperature issue resolved
      • Issue w/overflow
  • DragonFruit
    • 2 Boards
      • One is inconsistent with packet sending
        • Possibly due to regulator issue
      • Second board working and ready to deploy soon
    • Deployed both boards in room

Gateway

  • Need to implement new adapters
    • Do with box deployment
  • Resolved crashing issue w/imperfect packets
  • Fixed unit issues w/certain packets

Database

  • Began initialization of database
  • CDR this Saturday
  • Gantt Chart
    • Future designs
      • Multiple sampling not a priority
      • Talk more with forecasting team
      • Minimizing power consumption
      • GPS implementation w/real-time clock
      • Fix time formatting for forecasting team
      • Extra field for W/m^2
        • Conversion done by gateway

Authors

Contributing authors:

tbyers

Created by tbyers on 2016/11/11 02:34.

  • ust/meeting_minutes_november_10_2016.txt
  • Last modified: 2021/09/19 21:59
  • (external edit)