weatherbox:guava:week_1_-_september_1st_2019

Team Guava absorbed Diwen, a member from team Grasshopper EE 296. This introductory meeting was to orient Diwen into Guava's philosophy and the current state of Revision C. Since the device hasn't been ran ever since last spring semester we took the time to jerry-rig up a way to see if the board still works and charge a specific battery.

Testing the board out with a freshly charged battery fried some parts of your board. This resulted in the board losing its reset functionality and will therefore require us to troubleshoot. Using a mixture of reading the schematic, multimeter and soldering/unsoldering on new parts we came out with the conclusion that debugging this would require more manpower. Luckily the first board we created was still functional and will therefore be our main testing bed.