 +====== Date: 12 March 2018 ======
 +  * Continued brainstorming constructions aspects of Wind Tunnel
 +  * Awaiting additional parts to arrive
 +
 +
 ====== Date: 14 March 2018 ====== ====== Date: 14 March 2018 ======
   * Received additional parts for Wind Tunnel (including fans, building materials, and additional Teensy devices)   * Received additional parts for Wind Tunnel (including fans, building materials, and additional Teensy devices)
   * Continued work on Wind Tunnel   * Continued work on Wind Tunnel
 +
 +====== Date: 15 March 2018 ======
 +  * Tested PC fans for voltage limits (all 4 in parallel)
 +  * Constructed second Wind Tunnel shell for testing
 +  * Brainstormed how to connect all 4 fans together in a grid
 +
 +====== Date: 16 March 2018 ======
 +  * Worked on CDR Presentation
 +  * Presentation will be next Tuesday due to a member being absent for presentation day
 +  * Planned cuts for materials (airflow straightener,​ plexiglass)