wind_sensor:meeting_minutes_week_9_2018

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
wind_sensor:meeting_minutes_week_9_2018 [2018/03/14 20:41]
jmcconnell
wind_sensor:meeting_minutes_week_9_2018 [2021/09/19 21:59] (current)
Line 7: Line 7:
   * Received additional parts for Wind Tunnel (including fans, building materials, and additional Teensy devices)   * Received additional parts for Wind Tunnel (including fans, building materials, and additional Teensy devices)
   * Continued work on Wind Tunnel   * Continued work on Wind Tunnel
 +
 +====== Date: 15 March 2018 ======
 +  * Tested PC fans for voltage limits (all 4 in parallel)
 +  * Constructed second Wind Tunnel shell for testing
 +  * Brainstormed how to connect all 4 fans together in a grid
 +
 +====== Date: 16 March 2018 ======
 +  * Worked on CDR Presentation
 +  * Presentation will be next Tuesday due to a member being absent for presentation day
 +  * Planned cuts for materials (airflow straightener,​ plexiglass)
  • wind_sensor/meeting_minutes_week_9_2018.1521060119.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)