wind_sensor:meeting_minutes_week_9_2018 [2018/03/15 21:35]
jmcconnell
wind_sensor:meeting_minutes_week_9_2018 [2021/09/19 21:59] (current)
Line 12: Line 12:
   * Constructed second Wind Tunnel shell for testing   * Constructed second Wind Tunnel shell for testing
   * Brainstormed how to connect all 4 fans together in a grid   * Brainstormed how to connect all 4 fans together in a grid
 +
 +====== Date: 16 March 2018 ======
 +  * Worked on CDR Presentation
 +  * Presentation will be next Tuesday due to a member being absent for presentation day
 +  * Planned cuts for materials (airflow straightener,​ plexiglass)