     * Deciding factor is the wind tunnel'​s storage. ​     * Deciding factor is the wind tunnel'​s storage. ​
     * Which would be on top of the microwave of HH 492, 1240 mm, or on the higher shelf with a length of 1870 mm.     * Which would be on top of the microwave of HH 492, 1240 mm, or on the higher shelf with a length of 1870 mm.
 +
 +====== Date: 8 February 2018 ======
 +  * Discussed wind tunnel design further
 +  * Created a SolidWorks model of a 1'​x1'​x3'​ SCEL Wind Tunnel v1.0
 +  * Began Ron Ho purchasing process (Completed Step 1 and currently researching parts to order)