forecasting:meeting_minutes_october_18_2016

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

forecasting:meeting_minutes_october_18_2016 [2016/10/19 03:09]
jobatake
forecasting:meeting_minutes_october_18_2016 [2021/09/19 21:59]
Line 1: Line 1:
-====== Forecasting Meeting Minutes for Week of October 18, 2016 ====== ​ 
-** Present Monday: Austin, Gordon, Brieanna, Jaimie ** 
  
-** Present Tuesday: Gordon, Brieanna, Jaimie ** 
- 
-===== Updates ===== 
-  * Ask Sharif to meet with us 
- 
-===== Meeting with Dr. Kuh ===== 
-===== Expectations ===== 
-  * 3D plot: 2011, 2012 normalized and unnormalized for comparison 
-  * LA more variation, but smoother 
- 
-  * Moving Average and Decimation/​Downsample 
-  * D and X from 2011: 
-  * X = 8:00-4:00 (input data) 
-  * D = 9:00-5:00 (normalized and downsampled,​ column) 
-  * Y = Least Squares Equation = W.T(X) row = X.T(W) column 
-  * Unnormalized = D bar, Y bar 
-    * Statistical:​ 
-      * Y - sig*Y + m 
-      * D - sig*D + m 
-    * Zenith: 
-      * Y*cos(theta) 
-      * D*cos(theta) 
-  * W = (XX.T)^(-1)*XD <= XX.T*W = XD 
-  * E^2 Averaged = (D-Y)^2 for every time 
-  * MSE = 1/m (||D-Y||)^2 
-  * Don't need r bc cancel 
-  * Ask Seyed what he did for decimation/​downsample 
-    * 1) Average and down sample 
-    * 2) Take moving average 
-    * Overlapping data points: 
-      * 8:01-8:10 moving average 
-      * Then downsample 
-  * Filter then normalize 
-  * <​del>​Normalize then filter</​del>​ 
-    * **Normalization:​ mean then deviation** 
-    * Zenith Angle Filter: Zenith angle is from the 5th minute, 5 irradiance is averaged 
-      * Bias term 
-        * Number of taps is # present + number before 
-          * 1 tap = present 
-          * 2 tap = present + future (5 mins in our case) 
-        * In weight matrix 
-          * Row of 1's to the matrix to get bias term 
-    * Statistical normalization:​ -mean/​deviation 
-      * Standard normalization 0 mean 
-  * Estimate will need to be given back after the normalization 
-  * 3D plot for both zenith and stat normalization 
-  * Plot MSE 
-    * y = MSE, x = # taps 
-    * Train error goes down, test error decreases until flattens or increases 
-  * Check 2012 MSE test against 2011 MSE train 
-    * Keep 2011 W 
-    * Get new X, D to compute new Y 
-  * Flip: 2011 MSE test against 2012 MSE train 
  • forecasting/meeting_minutes_october_18_2016.txt
  • Last modified: 2021/09/19 21:59
  • (external edit)