instrumentation:cvl:initial_specification

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
instrumentation:cvl:initial_specification [2016/01/18 06:38]
kluong [Expectations]
instrumentation:cvl:initial_specification [2021/09/19 21:59] (current)
Line 48: Line 48:
 ====== MVP ====== ====== MVP ======
  
-Since the initial project is being done in one semester a minimum viable product (MVP) must be built instead of a more polished prototype. See this page for more details: https://​en.wikipedia.org/​wiki/​Minimum_viable_product+Since the initial project is being done in one semester a **minimum viable product** (MVP) must be built instead of a more polished prototype. See this page for more details: https://​en.wikipedia.org/​wiki/​Minimum_viable_product
  
 Think about how we can build something that will be of benefit to the most people. Someone should ultimately at the end find some use out of the tool - polishing of the tool, regardless of hardware or software can be accomplished after we have something that is done.  Think about how we can build something that will be of benefit to the most people. Someone should ultimately at the end find some use out of the tool - polishing of the tool, regardless of hardware or software can be accomplished after we have something that is done. 
Line 55: Line 55:
 ====== Expectations ====== ====== Expectations ======
  
-  - Drive progress ​independently ​+  - Drive progress ​as a team (with help from mentors/​advisers) ​
   - Ask questions   - Ask questions
   - Consult with other teams   - Consult with other teams
  • instrumentation/cvl/initial_specification.1453099112.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)