weatherbox:apple:meeting_minutes_december_10_2015

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
weatherbox:apple:meeting_minutes_december_10_2015 [2015/12/11 02:09]
dkvilla created
weatherbox:apple:meeting_minutes_december_10_2015 [2021/09/19 21:59] (current)
Line 3: Line 3:
  
 ===== Updates ===== ===== Updates =====
 +  * Comment about the Power Budgets being incorrect
   * Paper   * Paper
     * Abstract     * Abstract
Line 10: Line 11:
     * Might have Christie set up a drop-box for us to turn in     * Might have Christie set up a drop-box for us to turn in
     * E-mail the final paper on Friday. ​     * E-mail the final paper on Friday. ​
-    * First Come first serve+    * First come first serve, feedback wise.
   * Set target dates up in the report   * Set target dates up in the report
     * testing, when the layout is done, when we are gonna send out the board to be manufactured     * testing, when the layout is done, when we are gonna send out the board to be manufactured
Line 16: Line 17:
     * We are expected to have troubleshooting to do, whether it was our part or not.     * We are expected to have troubleshooting to do, whether it was our part or not.
     * Trouble shoot while we design     * Trouble shoot while we design
-    ​*  +  ​Jon and Jason will be leaving us as Mentors. 
-  * Set dates that we need to accomplish time. +  * Begin to start talking ​to Dragonfruit ​and the Cranberry ​as well. 
-  * We're losing mentors. +  * Grading will be more formalized ​this semester.
-  * Talk to dragonfruit ​and the cranberry ​as well. +
-  * Grading will be more formalized.+
   * If initial objectives are met, he'll give an A.   * If initial objectives are met, he'll give an A.
-  * Spring Break - he expects a few boxes already deployed.+  * By Spring Break - he expects a few boxes already deployed.
   * 396 completely done before we can continue the project.   * 396 completely done before we can continue the project.
     * Doesn'​t recommend taking it as a 496 next semester. ​     * Doesn'​t recommend taking it as a 496 next semester. ​
Line 37: Line 36:
   * N/A   * N/A
  
- +[[weatherbox:​apple:​start|Back to the Apple Homepage]]
-[[weatherbox:​apple:​startBack to the Apple Homepage]] +
- +
- +
  • weatherbox/apple/meeting_minutes_december_10_2015.1449799748.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)