 +  * Tryston is setting up a meeting with Garmire who will take us to the roof to put up our board
 +    * need to make sure board works and have a battery ready
   * 3.3 Voltage Regulator was thought to be faulty on board 5   * 3.3 Voltage Regulator was thought to be faulty on board 5
     * Regulator still didn't output anything when part was replaced     * Regulator still didn't output anything when part was replaced
Line 11: Line 14:
   * Updated bill of materials for version 2   * Updated bill of materials for version 2
   * Waiting on key to use roof for testing   * Waiting on key to use roof for testing
- 
 ==== Problems ====  ==== Problems ==== 
   * Late to get the key to roof   * Late to get the key to roof
Line 22: Line 24:
       * to be completed for adafruit charging chip and dragon fruit charging chip       * to be completed for adafruit charging chip and dragon fruit charging chip
       * 5bits = 31 in decimal       * 5bits = 31 in decimal
-      * 0 = 3V +      * 00000 = 0 = 3V 
-      * 9 = 3.9V +      * 01001 = 9 = 3.9V 
-      * 13 = 4.3V +      * 01101 = 13 = 4.3V 
-      * 20 = 5V+      * 10100 = 20 = 5V
     * 2 - Use 3 debug LEDs to visually indicate when switching between solar panel and battery     * 2 - Use 3 debug LEDs to visually indicate when switching between solar panel and battery
       * LED 1 : Vload = Solar Panel        * LED 1 : Vload = Solar Panel 