weatherbox:dragonfruit:meeting_minutes_february_24_2017

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:dragonfruit:meeting_minutes_february_24_2017 [2017/02/25 01:31]
tyamauchi [Tasks]
weatherbox:dragonfruit:meeting_minutes_february_24_2017 [2021/09/19 21:59] (current)
Line 8: Line 8:
     * Next, test with solar irradiance     * Next, test with solar irradiance
 ==== Problems ====  ==== Problems ==== 
-  * Unsure what caused ​the board to stop transmitting ​+  * Unsure what caused ​deployed ​board to stop transmitting 
 +    * battery test proves that the board can still operate  
 +  * Recently populated board (board 5) unable to program
 ==== Tasks ====    ​ ==== Tasks ====    ​
   * Program and debug populated board   * Program and debug populated board
     * Board has not been able to program     * Board has not been able to program
     * Possible that some parts need to be swapped out     * Possible that some parts need to be swapped out
 +  * Continuity test of board 5
   * Decide where to place diodes, 0Ω resistors, and new parts   * Decide where to place diodes, 0Ω resistors, and new parts
   * Swap solar panel connector   * Swap solar panel connector
   * Create another spot on csv file for measuring voltage at XBee pin    * Create another spot on csv file for measuring voltage at XBee pin 
     * Will be used to look for ghost voltage     * Will be used to look for ghost voltage
  • weatherbox/dragonfruit/meeting_minutes_february_24_2017.1487986265.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)