Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
weatherbox:dragonfruit:meeting_minutes_october_30_2017 [2017/11/03 22:23] tyamauchi [Updates 10/23] |
weatherbox:dragonfruit:meeting_minutes_october_30_2017 [2021/09/19 21:59] (current) |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | =====Dragonfruit Team Meeting - October 16th, 2017===== | + | =====Dragonfruit Team Meeting - October 30th, 2017===== |
Attended: Kevin, Kyaw, Tyler | Attended: Kevin, Kyaw, Tyler | ||
- | ==== Updates 10/30 ==== | + | ==== Updates 11/6 ==== |
- | * Soldering new board | + | * Started Critical Design Review presentation |
- | * Came across a problem | + | * Spoke to Dr. Garmire about taking down board |
- | * 5V boost converter is out of parts | + | * Made edits to housing |
- | * The specific part NCP1402SN50T1GOSCT-ND is no longer manufactured by digi-key | + | * Hole for power cycling |
- | * The part we do have is a 5V regulator with pins that do not match our board | + | * closing off holes on the top |
+ | * Updated SCEL Inventory | ||
- | ==== Updates 11/3 ==== | ||
- | * Finished soldering everything besides 5V regulators | ||
- | * Desoldering boost converters from spark fund breakout boards | ||
- | * | ||
==== Tasks ==== | ==== Tasks ==== | ||
+ | * <del>Contact Dr. Garmire about rooftop access</del> | ||
* Review csv file for Weatherbox deployment analysis | * Review csv file for Weatherbox deployment analysis | ||
- | * Investigate short circuit current of solar panel (Kyaw) | + | * <del>Make sure desoldered boost converter acts the way we want it to</del> |
+ | * Housing for board | ||
+ | * Make Critical Design Review presentation | ||
+ | * Take board down from roof | ||
+ | * Review theories for intermittent transmission | ||
+ | * Final Paper due Friday Dec 15 | ||
+ | * Final Presentation Dec 2nd | ||
+ | * Use up Ron Ho Fund |