weatherbox:verification:meeting_minutes_-_february_23_2016 [2016/02/24 04:55]
leekrist
weatherbox:verification:meeting_minutes_-_february_23_2016 [2021/09/19 21:59] (current)
Line 1: Line 1:
 ====== Verification Team Meeting - February 23, 2016 ====== ====== Verification Team Meeting - February 23, 2016 ======
  
-Attended: May Chen, Kristie Lee, Garrett Young+Attended: May Chen, Kristie Lee, Garrett Young, Kenny Luong
  
 =====Notes===== =====Notes=====
   * Repeat parts as much as possible: for example, Dragonfruit and Cranberry are practically interchangeable   * Repeat parts as much as possible: for example, Dragonfruit and Cranberry are practically interchangeable
       * We changed our voltage regulators to the MIC5219 for this reason       * We changed our voltage regulators to the MIC5219 for this reason
 +  * Verification board/Apple power
 +      * We are powering VB with power source
 +      * We WERE going to power Apple from our board
 +      * We SHOULD CONSIDER powering Apple from a battery and VB check the voltage
 +  * Pin connections
 +      * VB is checking Apple circuit, connect each voltage point to an ADC pin
 +          * Each sensor needs its own pin
  
 =====Accomplishments===== =====Accomplishments=====
   * Connected everything on EAGLE schematic   * Connected everything on EAGLE schematic
 +  * Had schematic checked by Kenny
  
 =====Goals===== =====Goals=====
-  * Have schematic ​verified and route board+  * Fix schematic ​connections 
 +  * Talk to Apple to see what should be tested