Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
training:bill_of_materials [2016/01/19 00:50]
kluong created
training:bill_of_materials [2021/09/19 21:59] (current)
Line 1: Line 1:
 +
 ====== Bill of Materials ====== ====== Bill of Materials ======
 +\\
 +\\
 +A bill of materials, often referred to as a BOM, is a list that contains the hardware components used in the project. The listed information includes the description of the parts, the vendor from which the parts were bought from, the product identification/​number,​ the unit cost, and the quantity. An important part of the bill of materials is the total unit sub cost of the parts.  ​
  
 +====Example Bill of Materials==== ​
 +^Part Description ^Part Name ^Vendor ^Product ID/# ^Unit Cost ^Quantity ^
 +|Solar Irradiance Sensor Stabilizer |AL-100 Solar Sensor Leveling Plate|Apogee|AL-100|$35.00|1|
 +|**Total Unit Sub Cost**|$35.00|
  
-  * What is a bill of materials?+=====Assignment===== 
 +  - Create ​a bill of materials ​that includes the parts listed below: 
 +    - Atmel Atmega328P 
 +    - Maxim DS18B20 
 +    - Sensirion SHT11 
 +    - Adafruit BMP-180 
 +    - Tenergy 18650 
 +  - Email your Mentor/​Leadership Team with your team's completed bill of materials attached in .pdf or .xlsx with subject line "​[SCEL] Team *yournamehere'​s Sample BOM" (Don'​t ​ forget to cc "​[email protected]"​ in all your emails!).
  • training/bill_of_materials.1453164605.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)