Show pageOld revisionsBacklinksBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. =====Updates===== * * Finalizing housing design * Editing transmit code * Began health check code * Email Dr. Kuh about a meeting time ===Problems===== * Solar Irradiance sensor code wasn't working * Transmit Code isn't working * PCB design: the wire placement was hard to work out ===Solutions===== * Soloar Irradiance: changed the pin placement on the sensor * Transmit Code: * PCB design: moved wires around until they didn't cross ===Reminders=== *Finish trasmit code by Friday *Finish weatherbox.ino by Friday *Complete most of the health check *Meeting with Dr. Kuh weatherbox/team_rocket/meeting_minutes_march_30th_2016.txt Last modified: 2021/09/19 21:59(external edit)