Show pageOld revisionsBacklinksBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. ====== Date: 9 April 2018 ====== * Attached fan assembly to Wind Tunnel * Tested voltages and speeds * Began sealing outer frame ====== Date: 11 April 2018 ====== * Continued testing of fans installed * Tested existing Teensy and microphone assembly * Wrote test program to confirm functionality * Researching why previous team's programs won't download from Google Drive ====== Date: 12 April 2018 ====== * Testing more of firmware * Will reach out to Scott for additional assistance with program on Google Drive * Began creation of air flow straightener ====== Date: 13 April 2018 ====== * Firmware testing wind_sensor/meeting_minutes_week_13_2018.txt Last modified: 2021/09/19 21:59(external edit)