weatherbox:guava:week_4_-_february_4_2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
weatherbox:guava:week_4_-_february_4_2019 [2019/02/27 02:08]
aereno
weatherbox:guava:week_4_-_february_4_2019 [2019/02/27 02:24]
aereno
Line 6: Line 6:
  
 ==== February 8 Meeting Time (Aljaed: 1:30 - 4:00) ==== ==== February 8 Meeting Time (Aljaed: 1:30 - 4:00) ====
-Finished the capacitors and was able to get two sides of the MCU into the board. ​ One of the main modules that was needed to be integrated into the board is the GPS(GTPA013) and a library was needed for it as such this was used as the basis of Aljaed'​s EAGLE exercise.+Finished the capacitors and was able to get two sides of the MCU into the board. ​ One of the main modules that was needed to be integrated into the board is the GPS(GTPA013) and a library was needed for it as such this was used as the basis of Aljaed'​s EAGLE exercise. ​ 
 + 
 +{{ :​weatherbox:​guava:​humidity_vs_time_.png?​nolink&​200}}  
 +// 
 +{{ :​weatherbox:​guava:​pressure_vs_time_.png?​nolink&​200}}  
 +{{ :​weatherbox:​guava:​temperature_vs_time.png?​nolink&​200}} 
 +{{ :​weatherbox:​guava:​Battery_vs_time.png?​nolink&​200}}  
 + 
  
-{{ :​weatherbox:​guava:​humidity_vs_time_.png?​nolink 300x100}} 
  
  • weatherbox/guava/week_4_-_february_4_2019.txt
  • Last modified: 2021/09/19 21:59
  • (external edit)