Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
weatherbox:guava:week_7_-_march_2_2020 [2020/04/09 23:38] dlin [March 5th, 2020] |
weatherbox:guava:week_7_-_march_2_2020 [2021/09/19 21:59] (current) |
||
---|---|---|---|
Line 4: | Line 4: | ||
Overall, we manage to find all the parts we need to assemble up to 5 REV D, for Mouser it comes up to be around 79.56 and for Digikey, it comes up to around 81.45. Also, we sent Dr. Kuh our Ron Ho fund. | Overall, we manage to find all the parts we need to assemble up to 5 REV D, for Mouser it comes up to be around 79.56 and for Digikey, it comes up to around 81.45. Also, we sent Dr. Kuh our Ron Ho fund. | ||
- | //Members: Diwen, Rylie, Max//-- | + | //Members: Diwen, Riley, Max// |
//Time: 3:30PM - 5:30PM// | //Time: 3:30PM - 5:30PM// | ||
Line 12: | Line 13: | ||
Overall, we manage to finish up the REV D design with the electrolytic capacitor. Our goal is to have Dr. Kuh sign our form before Spring Break, once we get back from the break, we can start soldering the parts and hopefully deploy this semester. | Overall, we manage to finish up the REV D design with the electrolytic capacitor. Our goal is to have Dr. Kuh sign our form before Spring Break, once we get back from the break, we can start soldering the parts and hopefully deploy this semester. | ||
- | //Members: Diwen, Rylie, Max//-- | + | //Members: Diwen, Riley, Max// |
//Time: 1:00PM - 4:00PM// | //Time: 1:00PM - 4:00PM// |