So far Team Guava finished Bare Guava, documented how to boot-load ATMEGA 1284P with 8Mhz and 5V, fixed trace errors with the solar charging chip, uniform all the capacitors and resistors to 0805, REV D design and parts. | So far Team Guava finished Bare Guava, documented how to boot-load ATMEGA 1284P with 8Mhz and 5V, fixed trace errors with the solar charging chip, uniform all the capacitors and resistors to 0805, REV D design and parts. | ||