-=====October 29th, 2019===== 
-Finished and turned in the mid semester project report which detailed that our current problem is getting our pcb design approved, programming our board and creating our own bareduino. Something we didn't take into effect is that on our PCB design we didn't do a DRC check, upon checking on our errors we realized that the design has 41 errors. Most errors are tiny airwaves within the parts which comes from changing between measurements while connecting the wires. ​ 
- 
-=====October 31th, 2019===== 
  