weatherbox:bumblebee:week_2_-_january_22_2018

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:bumblebee:week_2_-_january_22_2018 [2018/01/26 20:21]
awong
weatherbox:bumblebee:week_2_-_january_22_2018 [2021/09/19 21:59] (current)
Line 22: Line 22:
       * Had problems with FTDI       * Had problems with FTDI
   * Looked over code on GitHub   * Looked over code on GitHub
 +  * Inventory taken
 +  * Met with Dr. Kuh
  
 ===To Do=== ===To Do===
-  * Take inventory ​and figure out what parts need to be ordered +  * Get with housing team and begin fabrication 
-  * Make a second Breadboard+  * Range Testing 
 +  * Debugging of breadboard 
 +  * Firmware