weatherbox:bumblebee:week_4_-_september_25_2017

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:bumblebee:week_4_-_september_25_2017 [2017/09/28 00:32]
rrupley [Meeting Minutes September 27,2017]
weatherbox:bumblebee:week_4_-_september_25_2017 [2021/09/19 21:59] (current)
Line 4: Line 4:
  
   * Changed chip and a few wires to see if that was the problem   * Changed chip and a few wires to see if that was the problem
 +  * Making sure connections were good makes the board work. Everything now works as it should
  
  
Line 10: Line 11:
 **Attended:​Isaiah,​ Kayla, Rebecca** **Attended:​Isaiah,​ Kayla, Rebecca**
  
-  * Parts List +  * Started on schematic 
-  * Worked ​on schematic+ 
 +==== Meeting Minutes September 29,2017 ==== 
 +**Attended:​Isaiah,​ Kayla, Rebecca** 
 + 
 +  * Continued working ​on schematic 
 +  * Decided no need to add to Parts Order, but may look into XBIB in the future.
  • weatherbox/bumblebee/week_4_-_september_25_2017.1506558779.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)