weatherbox:bumblebee:week_6_-_february_18_2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:bumblebee:week_6_-_february_18_2019 [2019/02/23 01:47]
mmansanao
weatherbox:bumblebee:week_6_-_february_18_2019 [2021/09/19 21:59] (current)
Line 5: Line 5:
  
 === Updates ===  === Updates === 
-  * //Started with the new PCB design//*+  * //Started with the new PCB design//
       - Changes in the new design:       - Changes in the new design:
           - Solar charing chip ---> Breakout board           - Solar charing chip ---> Breakout board
Line 22: Line 22:
 === Updates ===  === Updates === 
   * Continue finishing up PCB board on Eagle    * Continue finishing up PCB board on Eagle 
-      - Confirm with Kenneth ​+      - Confirm with Kenneth ​about connections ​
-bout connections ​+
  
 ===To Do=== ===To Do===
-  *  ​+  *  ​Finalize PCB design  
 +  * Order PCB on Seed Studios next week  
 +     - Since Ron Ho Funds is still not in business, Dr. Kuh said he'll talk to Josh about the purchase. ​ 
  • weatherbox/bumblebee/week_6_-_february_18_2019.1550886443.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)