weatherbox:dragonfruit:meeting_minutes_february_13_2017

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:dragonfruit:meeting_minutes_february_13_2017 [2017/02/18 03:07]
tyamauchi [Updates]
weatherbox:dragonfruit:meeting_minutes_february_13_2017 [2021/09/19 21:59] (current)
Line 7: Line 7:
     * We believe the board stopped transmitting due to a ghost voltage as it might have done before     * We believe the board stopped transmitting due to a ghost voltage as it might have done before
   * Revamped housing design   * Revamped housing design
 +  * Printed out Dragon Fruit Schematic
 ==== Problems ====  ==== Problems ==== 
   * Board died on Saturday February 11th   * Board died on Saturday February 11th
   * Last packet sent was at 7:49 am    * Last packet sent was at 7:49 am 
-  * There was a rainstorm on this day, water probably the cause +  * There was a rainstorm on this day, <​del> ​water probably the cause</​del>​ 
- +  * No water damage, but uncertain why packets stopped sending 
-==== Goals ====    ​+    * should try to make the housing more water tight 
 +  * Currently not deployed 
 +==== Tasks ====    ​
   * Program and debug populated board   * Program and debug populated board
-  ​revamp housing +    ​Not having much luck 
-  * discover the problem ​for why  +    * May need to do a board check 
 +    * Possible that some parts need to be swapped out 
 +  * Battery Test (began on 4/17) 
 +  * Remove LED pins on MCP to use for Ghost Voltage Tests 
 +  * Decide where to place diodes, 0Ω resistors, and new parts 
 +  * Swap solar panel connector 
 + 
  • weatherbox/dragonfruit/meeting_minutes_february_13_2017.1487387249.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)