weatherbox:dragonfruit:meeting_minutes_february_13_2017

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:dragonfruit:meeting_minutes_february_13_2017 [2017/02/18 03:23]
tyamauchi [Tasks]
weatherbox:dragonfruit:meeting_minutes_february_13_2017 [2021/09/19 21:59] (current)
Line 20: Line 20:
     * May need to do a board check     * May need to do a board check
     * Possible that some parts need to be swapped out     * Possible that some parts need to be swapped out
-  * Battery Test+  * Battery Test (began on 4/17)
   * Remove LED pins on MCP to use for Ghost Voltage Tests   * Remove LED pins on MCP to use for Ghost Voltage Tests
-  * decide ​where to place Diodes, 0Ω resistors, and new parts+  * Decide ​where to place diodes, 0Ω resistors, and new parts 
 +  * Swap solar panel connector 
  
  • weatherbox/dragonfruit/meeting_minutes_february_13_2017.1487388206.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)