Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
training:bill_of_materials [2016/01/22 00:00] dkvilla |
training:bill_of_materials [2021/09/19 21:59] (current) |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Bill of Materials ====== | ====== Bill of Materials ====== | ||
+ | \\ | ||
+ | \\ | ||
A bill of materials, often referred to as a BOM, is a list that contains the hardware components used in the project. The listed information includes the description of the parts, the vendor from which the parts were bought from, the product identification/number, the unit cost, and the quantity. An important part of the bill of materials is the total unit sub cost of the parts. | A bill of materials, often referred to as a BOM, is a list that contains the hardware components used in the project. The listed information includes the description of the parts, the vendor from which the parts were bought from, the product identification/number, the unit cost, and the quantity. An important part of the bill of materials is the total unit sub cost of the parts. | ||