weatherbox:dragonfruit:meeting_minutes_february_27_2017

This is an old revision of the document!


Attended: Kevin, Gordon, Tyler

  • Tested board 3 (previously deployed) transmission with irradiance
    • This board would end transmission whenever
  • Parts on board 5 were desoldered off of the decommissioned board 4
    • We suspect that some of these parts were damaged after desoldering
  • Debug populated board 5
    • Some parts need to be swapped out
  • Continuity test of board 5
  • Decide where to place diodes, 0Ω resistors, and new parts
  • Swap solar panel connector
  • Create another spot on csv file for measuring voltage at XBee pin
    • Will be used to look for ghost voltage
  • Look into power switching of charging chip