Show pageOld revisionsBacklinksBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. ====== Team Apple Meeting Minutes 3/17/16 ====== **Attended: Kaeo, Tryston, Tyrin, Michael, Ernesto, Brianne** ===== Updates ===== * Finished soldering passive components * Got 5 irradiance sensors mounted to the leveling plate and crimped the wires * Soldered wires to temperature sensors and crimped the wires * Got second prototype of the housing * Currently making adjustments for housing * Flipped the chip to get the pins for IC switch in its correct position ===== Issues ===== * On the PCB the left and right side of the IC switch are switched so first pin is located on the right side instead of starting from the left side * Even though we flipped the chip to get the correct pins in their proper place the power wonʻt go through ===== Reminders ===== * Research mounting techniques [[weatherbox:apple:start|Back to the Apple Homepage]] weatherbox/apple/meeting_minutes_march_17_2016.txt Last modified: 2021/09/19 21:59(external edit)