weatherbox:apple:meeting_minutes_march_17_2016

Team Apple Meeting Minutes 3/17/16

Attended: Kaeo, Tryston, Tyrin, Michael, Ernesto, Brianne

  • Finished soldering passive components
  • Got 5 irradiance sensors mounted to the leveling plate and crimped the wires
  • Soldered wires to temperature sensors and crimped the wires
  • Got second prototype of the housing
  • Currently making adjustments for housing
  • Flipped the chip to get the pins for IC switch in its correct position
  • On the PCB the left and right side of the IC switch are switched so first pin is located on the right side instead of starting from the left side
  • Even though we flipped the chip to get the correct pins in their proper place the power wonĘ»t go through
  • Research mounting techniques

Back to the Apple Homepage

Authors

Contributing authors:

mleong

Created by mleong on 2016/03/17 23:06.

  • weatherbox/apple/meeting_minutes_march_17_2016.txt
  • Last modified: 2021/09/19 21:59
  • (external edit)