weatherbox:bumblebee:week_8_-_october_15_2018

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:bumblebee:week_8_-_october_15_2018 [2018/10/20 01:45]
sjavier [Meeting Minutes October 19, 2018]
weatherbox:bumblebee:week_8_-_october_15_2018 [2021/09/19 21:59] (current)
Line 24: Line 24:
  
 ===To Do=== ===To Do===
-  * we know that our codes work. next time we're run it with our board +  * we know that our codes work. next time we'll run it with our board 
  
 ==== Meeting Minutes October 19, 2018 ==== ==== Meeting Minutes October 19, 2018 ====
Line 34: Line 34:
   * Did range testing: Line-of-sight   * Did range testing: Line-of-sight
   * Made gerber files for PCB and send it to Linda to order   * Made gerber files for PCB and send it to Linda to order
 +       - used sparkfun cam processor job 
 +       ​https://​learn.sparkfun.com/​tutorials/​using-eagle-board-layout/​generating-gerbers 
 + 
 ===To Do=== ===To Do===
   * More range testing with different variables   * More range testing with different variables
       - Through walls (not line-of-sight),​ different floors       - Through walls (not line-of-sight),​ different floors
-  * Research on the difference between Xbee Pro S2B and Xbee Pro S2C +
-      - since S2B is discontinued,​ may need to switch to S2C in the future+
  • weatherbox/bumblebee/week_8_-_october_15_2018.1539999909.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)