Show pageOld revisionsBacklinksBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. =====Cranberry Team Meeting #18 - February 26, 2016===== **Attended: Brandon, Kim** =====Updates===== * Determined method of connection for LEDs between boards * Corrected errors on updated schematic * Incorrect part used for batter connector * Sensor switch input required 3.3V rather than Solar panel voltage * Working on completing board layout =====Problems===== * N/A =====Reminders===== * Complete board layout as soon as possible * PDR on Saturday, March 5 * Meeting with Dr. Kuh this week weatherbox/cranberry/meeting_minutes_february_26_2016.txt Last modified: 2021/09/19 21:59(external edit)