weatherbox:cranberry:meeting_minutes_november_19_2015

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
weatherbox:cranberry:meeting_minutes_november_19_2015 [2015/11/21 09:37]
kpcastro created
weatherbox:cranberry:meeting_minutes_november_19_2015 [2021/09/19 21:59] (current)
Line 4: Line 4:
 =====Updates===== ​ =====Updates===== ​
  
-  * Although ​battery charges, unexpected ​voltages unable to be resolved; new board is assembled+  * Although ​expected ​voltages ​are obtained, battery ​unable to be charged; new board is assembled
   * Power module operational on new board   * Power module operational on new board
   * Proper voltages supplied to components   * Proper voltages supplied to components
Line 12: Line 12:
     * 2.0Kohm = 500mA     * 2.0Kohm = 500mA
   * Completed main components in Eagle   * Completed main components in Eagle
-    * Must complete ​misc. components+    * Remaining ​misc. components
       * Power module       * Power module
         * Schottky Diode         * Schottky Diode
  • weatherbox/cranberry/meeting_minutes_november_19_2015.1448098659.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)