Line 5: Line 5:
  
 ==== Parts Order ====  ==== Parts Order ==== 
- ​* ​Parts order came in - yay. Time to test. +Parts order came in - yay. Time to test. 
     * BME280     * BME280
-      * Using the Adafruit testing code from their github with an Arduino Uno to verify how it works+      * Using the Adafruit testing code from their github with an Arduino Uno to verify how/that it works
         * Going to hook it up using I2C first then SPI         * Going to hook it up using I2C first then SPI
-      ​* Dylan'​s code is to use with the whole board hooked up in the firmware of the whole box +        * I2C wiring - Using an Arduino Uno and the test code compiles and works. 
-      * +          * Reads Temperature/​Pressure/​Altitude/​Humidity 
 +        * SPI wiring - Using the same Arduino Uno the test code compiles and works 
 +      ​* Dylan'​s code is to use with the whole board hooked up in the firmware of the whole box like the driver for the sensor to use in whole system
     * ATmega1284P - DIP and TQFN packages.     * ATmega1284P - DIP and TQFN packages.
       * Need to breadboard a DIP one to start testing its functionalities and differences between the 328P       * Need to breadboard a DIP one to start testing its functionalities and differences between the 328P
  
 ==== Design/​Research ==== ==== Design/​Research ====
- 
   * Rain sensor   * Rain sensor
     * We have a solar sensor and wind sensor. Why not rain sensor?     * We have a solar sensor and wind sensor. Why not rain sensor?
Line 25: Line 26:
   * SCEL's participation in CoE's Open House is canceled due to a "full program" ​   * SCEL's participation in CoE's Open House is canceled due to a "full program" ​
   * April 29th, Final Presentation   * April 29th, Final Presentation
-  * +  * Final Paper - 4000 words - should start breaking up the paper into sections for people to write about now 
 +    * Topics 
 +      * Objective 
 +      * Project Description 
 +      * Block Diagram 
 +        * Hardware 
 +        * Firmware 
 +      * Parts  
 +        * BME 
 +        * ATmega 
 +          * Programmer circuit 
 +        * SP-215 
 +        * Charging Chip 
 +        * Xbee 
 +          * Firmware? 
 +        * Switches 
 +        * GPS 
 +          *  
 +      * Design Choices 
 +        * 3.3V vs 5V 
 +        * BME 
 +        * ATmega1284 
 +          * Why we went with this one and not another one 
 +          * pros and cons of each of these items 
 +        * Board Layout 
 +        * GPS/RTC 
 +      * Problems/​Solutions 
 +        * Time 
 +        * Hardware stuff 
 +      * Documentation 
 +        * How we did it 
 +      * Future Work 
 +        * Plans to continue 
 +        * What else were missing 
 +        * What we would have done differently 
 +        * What we could change 
 +      * Conclusion 
 +        * Where we are at now 
 +        * where we wanted to be 
 +        * Where we plan to go from here 
 +        * Experiences 
 +        * Lessons learned 
 + 