weatherbox:guava:week_2_-_january_21_2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
weatherbox:guava:week_2_-_january_21_2019 [2019/02/18 03:32]
aereno created
weatherbox:guava:week_2_-_january_21_2019 [2021/09/19 21:59] (current)
Line 1: Line 1:
-__January ​22 Meeting Time (Aljaed: 2:45 pm - 4:45 pm)__ \\ +==== January ​22 Meeting Time (Aljaed: 2:45 pm - 4:45 pm) ==== 
-Looking over past slides for the the proposal and trying to figure out what to write in our slides. \\+Looking over past slides for the the proposal and trying to figure out what to write in our slides. Start at continueing housing. ​ Use of an old housing and application of silicone to conceal any holes or opening to ensure water proofing. ​ Just had an issue with it sending packets improperly, We had an error in our GPS data.\\
  
-__January ​24 Meeting Time (Aljaed: 2:45 pm - 4:45 pm)__ \\ +==== January ​24 Meeting Time (Aljaed: 2:45 pm - 4:45 pm) ====  
-More information in the documentation,​ getting familiar with more version control. \\+More information in the documentation,​ getting familiar with more version control. Sanding/​cutting/​ reapplication of new adhesive, instead of silicone its liquid nail. \\
  
-__January ​25 Meeting Time (Aljaed: 1:30 pm - 2:30 pm)__ \\ +==== January ​25 Meeting Time (Aljaed: 1:30 pm - 2:30 pm) ====  
-Reviewing and updating the slides for the proposal. ​\\ +Reviewing and updating the slides for the proposal. ​Discussion with housing about a new housing being created in Fab Lab.  They suggested ventilation holes and a new mounting system. ​ Tried to find a bootloader to cut the clock speed to 8MHz at the same voltage; couldn'​t find any.\\
- +
-__January 26 Proposal Meeting__\\+
  
 +==== January 26 Proposal Meeting ====
  • weatherbox/guava/week_2_-_january_21_2019.1550460761.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)