weatherbox:guava:week_2_-_january_21_2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:guava:week_2_-_january_21_2019 [2019/02/23 01:52]
aereno
weatherbox:guava:week_2_-_january_21_2019 [2021/09/19 21:59] (current)
Line 2: Line 2:
 Looking over past slides for the the proposal and trying to figure out what to write in our slides. Start at continueing housing. ​ Use of an old housing and application of silicone to conceal any holes or opening to ensure water proofing. ​ Just had an issue with it sending packets improperly, We had an error in our GPS data.\\ Looking over past slides for the the proposal and trying to figure out what to write in our slides. Start at continueing housing. ​ Use of an old housing and application of silicone to conceal any holes or opening to ensure water proofing. ​ Just had an issue with it sending packets improperly, We had an error in our GPS data.\\
  
-__January ​24 Meeting Time (Aljaed: 2:45 pm - 4:45 pm)__ \\+==== January ​24 Meeting Time (Aljaed: 2:45 pm - 4:45 pm) ==== 
 More information in the documentation,​ getting familiar with more version control. Sanding/​cutting/​ reapplication of new adhesive, instead of silicone its liquid nail. \\ More information in the documentation,​ getting familiar with more version control. Sanding/​cutting/​ reapplication of new adhesive, instead of silicone its liquid nail. \\
  
-__January ​25 Meeting Time (Aljaed: 1:30 pm - 2:30 pm)__ \\+==== January ​25 Meeting Time (Aljaed: 1:30 pm - 2:30 pm) ==== 
 Reviewing and updating the slides for the proposal. Discussion with housing about a new housing being created in Fab Lab.  They suggested ventilation holes and a new mounting system. ​ Tried to find a bootloader to cut the clock speed to 8MHz at the same voltage; couldn'​t find any.\\ Reviewing and updating the slides for the proposal. Discussion with housing about a new housing being created in Fab Lab.  They suggested ventilation holes and a new mounting system. ​ Tried to find a bootloader to cut the clock speed to 8MHz at the same voltage; couldn'​t find any.\\
  
-__January ​26 Proposal ​Meeting__\\+==== January ​26 Proposal ​Meeting ====
  • weatherbox/guava/week_2_-_january_21_2019.1550886720.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)