Line 1: Line 1:
-__February ​5 Meeting Time (Aljaed: 2:45 - 5:00 pm)__ \\+==== February ​5 Meeting Time (Aljaed: 2:45 - 5:00 pm) ====
 Continued on soldering was able to successfully get the LED's and halfway done with the resistors that the LED's needed. Aljaed started on the EAGLE tutorials -provided by element13- to familiarize himself with PCB design.\\ Continued on soldering was able to successfully get the LED's and halfway done with the resistors that the LED's needed. Aljaed started on the EAGLE tutorials -provided by element13- to familiarize himself with PCB design.\\
  
-__February ​7 Meeting Time (Aljaed: 2:45 - 5:00 pm)__ \\ +==== February ​7 Meeting Time (Aljaed: 2:45 - 5:00 pm) ====  
-Continued soldering the resistors and moved into the capacitors. ​ Downloading/​installing and troubleshooting why Aljaed'​s install of EAGLE was different compared to the version found in the lab. \\+Continued soldering the resistors and moved into the capacitors. ​ Downloading/​installing and troubleshooting why Aljaed'​s install of EAGLE was different compared to the version found in the lab. Housing has sent details to start the fabrication of the housing; expected 1-2 days.\\ 
 + 
 +==== February 8 Meeting Time (Aljaed: 1:30 - 4:00) ==== 
 +Finished the capacitors and was able to get two sides of the MCU into the board. ​ One of the main modules that was needed to be integrated into the board is the GPS(GTPA013) and a library was needed for it as such this was used as the basis of Aljaed'​s EAGLE exercise.  
 + 
 +{{ :​weatherbox:​guava:​humidity_vs_time_.png?​nolink&​200}}  
 +{{ :​weatherbox:​guava:​pressure_vs_time_.png?​nolink&​200}}  
 +{{ :​weatherbox:​guava:​temperature_vs_time.png?​nolink&​200}} 
 +{{ :​weatherbox:​guava:​Battery_vs_time.png?​nolink&​200}}  
 + 
  
-__February 8 Meeting Time (Aljaed: 1:30 - 4:00)__ \\ 
-Finished the capacitors and was able to get two sides of the MCU into the board. ​ One of the main modules that was needed to be integrated into the board is the GPS(GTPA013) and a library was needed for it as such this was used as the basis of Aljaed'​s EAGLE exercise.\\ 
  