weatherbox:guava:week_4_-_february_4_2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:guava:week_4_-_february_4_2019 [2019/02/27 02:08]
aereno
weatherbox:guava:week_4_-_february_4_2019 [2021/09/19 21:59] (current)
Line 6: Line 6:
  
 ==== February 8 Meeting Time (Aljaed: 1:30 - 4:00) ==== ==== February 8 Meeting Time (Aljaed: 1:30 - 4:00) ====
-Finished the capacitors and was able to get two sides of the MCU into the board. ​ One of the main modules that was needed to be integrated into the board is the GPS(GTPA013) and a library was needed for it as such this was used as the basis of Aljaed'​s EAGLE exercise.+Finished the capacitors and was able to get two sides of the MCU into the board. ​ One of the main modules that was needed to be integrated into the board is the GPS(GTPA013) and a library was needed for it as such this was used as the basis of Aljaed'​s EAGLE exercise. ​ 
 + 
 +{{ :​weatherbox:​guava:​humidity_vs_time_.png?​nolink&​200}}  
 +{{ :​weatherbox:​guava:​pressure_vs_time_.png?​nolink&​200}}  
 +{{ :​weatherbox:​guava:​temperature_vs_time.png?​nolink&​200}} 
 +{{ :​weatherbox:​guava:​Battery_vs_time.png?​nolink&​200}}  
 + 
  
-{{ :​weatherbox:​guava:​humidity_vs_time_.png?​nolink 300x100}} 
  
  • weatherbox/guava/week_4_-_february_4_2019.1551233317.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)