Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
weatherbox:guava:week_5_-_february_11_2019 [2019/02/18 03:36]
aereno created
weatherbox:guava:week_5_-_february_11_2019 [2021/09/19 21:59] (current)
Line 1: Line 1:
-__February ​12 Meeting Time (Aljaed: 2:45 - 5:00 pm)__ \\ +==== February ​12 Meeting Time (Aljaed: 2:45 - 5:00 pm) ==== 
-Finished with the soldering of the MCU but was later on destroyed when being redone. ​ Settled on just designing in the lab computers. New resource is used for EAGLE for more help.\\+Finished with the soldering of the MCU but was later on destroyed when being redone. ​ Settled on just designing in the lab computers. New resource is used for EAGLE for more help. Housing is completed. ​ scheduled deployment next week tuesday with team apple. ​ Meanwhile the team inspects the housing ensuring everything fits.  Making sure their is enough space for the battery and doesn'​t hinder the functions of the internals. ​ For example their was an issue trying to get the untenna to get out of the housing through the expected hole already made.  Kyle from housing is thinking of alternatives.\\
  
-__February ​14 Meeting Time (Aljaed: 2:45 - 5:00 pm)__ \\+==== February ​14 Meeting Time (Aljaed: 2:45 - 5:00 pm) ====
 Finishing up on the design of the Symbol for the GPS and started getting to work on the footprint. Set up slides for the Preliminary design review.\\ Finishing up on the design of the Symbol for the GPS and started getting to work on the footprint. Set up slides for the Preliminary design review.\\
  
-__February ​15 Meeting Time (Aljaed: 1:30 pm - 5:00 pm)__ \\+==== February ​15 Meeting Time (Aljaed: 1:30 pm - 5:00 pm) ====
 Finished setting up the footprint and connecting both the footprint and symbol to create the device. \\ Finished setting up the footprint and connecting both the footprint and symbol to create the device. \\
  
-__February ​16 PDR__\\+==== February ​16 PDR ====
  • weatherbox/guava/week_5_-_february_11_2019.1550460980.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)