Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
weatherbox:guava:week_6_-_february_18_2019 [2019/02/23 02:18] aereno |
weatherbox:guava:week_6_-_february_18_2019 [2021/09/19 21:59] (current) |
||
---|---|---|---|
Line 9: | Line 9: | ||
===== February 22 Meeting Time (Aljaed/Rammell (2:15 pm - 4:45 pm)) ===== | ===== February 22 Meeting Time (Aljaed/Rammell (2:15 pm - 4:45 pm)) ===== | ||
- | Troubleshoot, why the deployment of the weather box was met with failure. Best conclusion is that since the solar panel was receiving more voltage than the other parts of the board not enough was used to power anything else. Just waiting on confirmation when we could retrieve the board from the roof. Just need to fill out the forms to gain access to the rooftop. Discussion about roof access. Need to fill out access forms for proper future permission | + | Troubleshoot, why the deployment of the weather box was met with failure. Best conclusion is that since the solar panel was receiving more voltage than the other parts of the board not enough was used to power anything else. Just waiting on confirmation when we could retrieve the board from the roof. Just need to fill out the forms to gain access to the rooftop. Discussion about roof access. Need to fill out access forms for proper future permission. Resume work and connecting via LinkedIn. |