Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:team_quasar:start [2016/04/02 07:56]
khien [Eagle]
weatherbox:team_quasar:start [2021/09/19 21:59] (current)
Line 1: Line 1:
-====== Team Quasar ======+======Team Quasar======
 //Updated: 1/20/2016// //Updated: 1/20/2016//
  
Line 7: Line 7:
  
 ---- ----
 +
 ===== Goals ===== ===== Goals =====
  
Line 19: Line 20:
      ​*Complete a working weatherbox      ​*Complete a working weatherbox
      *Have box record data for 2 days      *Have box record data for 2 days
 +
 +==Future Work==
 +[[weatherbox:​team_quasar:​ Things to finish]]\\ ​
  
 ---- ----
Line 50: Line 54:
 ===== Eagle ===== ===== Eagle =====
 {{:​weatherbox:​team_quasar:​schematics.png?​linkonly|Schematics}}\\ {{:​weatherbox:​team_quasar:​schematics.png?​linkonly|Schematics}}\\
-{{:​weatherbox:​team_quasar:​pcb_design.png?​linkonly|PCB Design}}\\+{{:​weatherbox:​team_quasar:​pcb_design.png?​linkonly|PCB Design}}
  
 ---- ----
- 
 ===== Housing ===== ===== Housing =====
  
-{{:​weatherbox:​team_quasar:​housing_back.png?​linkonly|Back View}} +{{:​weatherbox:​team_quasar:​housing_back.png?​linkonly|Back View}}\\ 
- +{{:​weatherbox:​team_quasar:​housing_front.png?​linkonly|Front View}}\\ 
-{{:​weatherbox:​team_quasar:​housing_front.png?​linkonly|Front View}} +{{:​weatherbox:​team_quasar:​housing_side.png?​linkonly|Side View}}\\ 
- +{{:​weatherbox:​team_quasar:​housing_top.png?​linkonly|Top View}}\\
-{{:​weatherbox:​team_quasar:​housing_side.png?​linkonly|Side View}} +
- +
-{{:​weatherbox:​team_quasar:​housing_top.png?​linkonly|Top View}}+
 ---- ----
  
Line 69: Line 69:
 ==== Charging Circuit Testing Results ====  ==== Charging Circuit Testing Results ==== 
  
-       1st Scenario (Without Battery) ​  ^^^ + 1st Scenario (Without Battery) ​                   ||| 
-^ Input ^ Battery ^ Load ^ +^ Input                            ^ Battery ​ ^ Load   ​
-6V 5.79V 4.25V +3V                               0.55V     0.69V  ​
-5V 4.23V 4.87V +4V                               0.53V    ​0.66V  ​
-5.5V | 4.23V | 4.24V +| 5V                               ​| 4.33V    ​| 4.8V   
-6.6V | 4.27 V6.38V +| 6V                               ​| 4.33V    ​5.83V  ​
-4V 0V 0V |+7V                               4.33V    ​6.82V  ​|
  
 ^        2nd Scenario (With Battery) ​         ^^^ ^        2nd Scenario (With Battery) ​         ^^^
Line 86: Line 86:
  
 ---- ----
- 
-{{:​weatherbox:​team_quasar:​packet_send_sensors.png?​200|}} 
  
 ====== Modules ====== ====== Modules ======
Line 112: Line 110:
  
 ====== Meeting Minutes ====== ====== Meeting Minutes ======
 +[[weatherbox:​team_quasar:​meeting_minutes_July_11_2016|296 Team Meeting - July 11, 2016]]\\
 +[[weatherbox:​team_quasar:​meeting_minutes_April_8_2016|296 Team Meeting - April 8, 2016]]\\
 +[[weatherbox:​team_quasar:​meeting_minutes_April_6_2016|296 Team Meeting - April 6, 2016]]\\
 +[[weatherbox:​team_quasar:​meeting_minutes_April_1_2016|296 Team Meeting - April 1, 2016]]\\
 [[weatherbox:​team_quasar:​meeting_minutes_March_30_2016|296 Team Meeting - March 30, 2016]]\\ [[weatherbox:​team_quasar:​meeting_minutes_March_30_2016|296 Team Meeting - March 30, 2016]]\\
 [[weatherbox:​team_quasar:​meeting_minutes_March_25_2016|296 Team Meeting - March 25, 2016]]\\ [[weatherbox:​team_quasar:​meeting_minutes_March_25_2016|296 Team Meeting - March 25, 2016]]\\
Line 136: Line 138:
 ---- ----
 ====== Meeting Logs ====== ====== Meeting Logs ======
- 
 ==Friday - 3/25/16== ==Friday - 3/25/16==
 Xbee seems to be working now. The transmission and packages sent were double checked by Kenny. Housing model is ready and the pcb design is ready to be milled. Jaimie has to double check the data transmission for battery voltage and solar voltage data. Xbee seems to be working now. The transmission and packages sent were double checked by Kenny. Housing model is ready and the pcb design is ready to be milled. Jaimie has to double check the data transmission for battery voltage and solar voltage data.
Line 209: Line 210:
  
 ====== Presentation slideshows ====== ====== Presentation slideshows ======
 +{{:​weatherbox:​team_quasar:​Quasar_final.pdf|Team_Quasar_Final_Presentation}}\\
 +{{:​weatherbox:​team_quasar:​Quasar_CDR_SP16.pdf|Team_Quasar_CDR_Presentation}}\\
 {{:​weatherbox:​team_quasar:​Team_Quasar_Proposal_Presentation.pdf|Team_Quasar_Proposal_Presentation}}\\ {{:​weatherbox:​team_quasar:​Team_Quasar_Proposal_Presentation.pdf|Team_Quasar_Proposal_Presentation}}\\
-{{:​weatherbox:​team_quasar:​team_quasar_pdr_presentation.pdf|Team_Quasar_PDR_Presentation}}+{{:​weatherbox:​team_quasar:​team_quasar_PDR_presentation.pdf|Team_Quasar_PDR_Presentation}}
 ---- ----
  • weatherbox/team_quasar/start.1459583785.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)