Date: 12 March 2018

  • Continued brainstorming constructions aspects of Wind Tunnel
  • Awaiting additional parts to arrive

Date: 14 March 2018

  • Received additional parts for Wind Tunnel (including fans, building materials, and additional Teensy devices)
  • Continued work on Wind Tunnel

Date: 15 March 2018

  • Tested PC fans for voltage limits (all 4 in parallel)
  • Constructed second Wind Tunnel shell for testing
  • Brainstormed how to connect all 4 fans together in a grid