Date: 12 March 2018
- Continued brainstorming constructions aspects of Wind Tunnel
- Awaiting additional parts to arrive
Date: 14 March 2018
- Received additional parts for Wind Tunnel (including fans, building materials, and additional Teensy devices)
- Continued work on Wind Tunnel
Date: 15 March 2018
- Tested PC fans for voltage limits (all 4 in parallel)
- Constructed second Wind Tunnel shell for testing
- Brainstormed how to connect all 4 fans together in a grid
Date: 16 March 2018
- Worked on CDR Presentation
- Presentation will be next Tuesday due to a member being absent for presentation day
- Planned cuts for materials (airflow straightener, plexiglass)